Design Guidelines
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
General Guidelines
- Room Numbering Guidelines
- Campus Wayfinding Signage Guidelines
- Facility Life Cycle Design Guidelines
- BIM Project Execution and Standards Guide
- File Naming Convention
- Tree Care Plan and Procedures
Procurement and Contracting Requirements
Division 00 - Procurement and Contracting Requirement
General Requirements
Division 01 - General Requirements
- Division 01 Appendices
- Appx C-1 Protection of Plantings and Landscape Features in a Construction Zone
- Appx C-2 Campus Woody Plant Protection Definitions
- Division 01 Comprehensive Guidelines
- 01 0100 Division 01 Designer Guidelines
- 01 1000 Summary
- 01 2300 Alternates
- 01 2500 Substitution Procedures
- 01 2900 Payment Procedures
- 01 3100 Project Management And Coordination
- 01 3200 Construction Progress Documentation
- 01 3300 Submittal Procedures
- 01 5000 Temporary Facilities And Controls
- 01 7700 Closeout Procedures
- 01 7823 Operation And Maintenance Data
- 01 7839 Project As-Built Documents
- 01 9113 General Commissioning Requirements
- 01 9119.43 Exterior Enclosure Commissioning
Facility Construction
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
- Division 08 Appendices
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
Division 09 - Finishes
- Division 09 Appendices
- Division 09 Comprehensive Guidelines
- 09 1000 Division 09 Designer Guidelines
- 09 3013 Ceramic Tiling
- 09 5113 Acoustical Panel Ceilings
- 09 6513 Resilient Base and Accessories
- 09 6516 Resilient Sheet Flooring
- 09 6519 Resilient Tile Flooring
- 09 6813 Tile Carpeting
- 09 6816 Sheet Carpeting
- 09 9123 Interior Painting
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
Facilities Services
Division 21 - Fire Suppression
- Division 21 Comprehensive
- 21 0500 Common Work Results For Fire Suppression
- 21 0513 Common Motor Requirements For Fire Suppression Equipment
- 21 1000 Water Based Fire Suppression Systems
- 21 3113 Electric Drive, Centrifugal Fire Pumps
- 21 3400 Pressure Maintenance Pumps
- 21 3900 Controllers For Fire-Pump Drivers
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
Division 22 - Plumbing
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
Division 26 - Electrical
Division 27 - Communications
- Division 27 Appendices
Division 28 - Electronic Safety and Security
- Division 28 Appendices
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33
Site and Infrastructure
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
- Division 33 Appendices
- MDEQ MS4 Permit
- Checklist for Stormwater Design Standards
- Stormwater Control Guidelines
- MDEQ Post-Construction Stormwater Runoff Controls Program
- EPA Supplemental Guide, Appendix F
- 33 0000 Div 33 Comprehensive
- 33 0100 Designer Guidelines
- 33 6313 Underground Steam And Condensate Distribution Piping
General | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33